Public projects
What’s being built, planned and funded in Bradford County, PA, from public records: state road and bridge work, the transportation plan, development before the planning board, new construction, and recovery work after floods. For contractors, suppliers and anyone watching where the area is headed. Bids to do the work are on Bids, RFPs and RFQs.
- 28state road and bridge projects under construction
- 68more planned
- 41new homes and apartments permitted in 2026 so far
State roads and bridges
Under construction (28)
| Project | Where | Expected done | Programmed |
|---|---|---|---|
| Microsurfacing
Tomahawk Rd to Murray Cr
N. Towanda, Ulster AND Athens Twps Tomahawk Rd to Murray Cr |
Athens Township, North Towanda Township, Ulster Township | $1.4 million | |
| SR 1062 (Cayuta Street) over Cayuta Creek and Norfolk Southern Railroad
Sayre Borough
Bridge replacement SR1062 over Cayuta Crk an |
Sayre Borough | $1 million | |
| Microsurface
SR 220 to Susquehanna River
Ulster Twp SR 220 to Susquehanna Riv |
Ulster Township | $46,000 | |
| SR 3008 (Southside Rd) over Tributary to Towanda Creek
Franklin Township
Bridge replacement SR 3008 over Trib Towanda |
Franklin Township | $285,097 | |
| SR6 East of Wyalusing
Wyalusing Township
Soil slide correction
Repairing AND Upgrading Embankments SR6 East of Wyalusing |
Wyalusing Township | $1.6 million | |
| Mill and resurface
SR 4022 (Wiliwana Road) from SR 220 ramps to SR 1069
Athens Twp SR 4022 Ramps to SR 1069 |
Athens Township | $2.8 million | |
| Upgrade bridge lighting from non-LED (HPS) to LED on SR 199 over Chemung River in Athens Twp, SR 220 over Towanda Creek in Monroeton Borough and
W. Packer Ave over NS RR and Lehigh Avenue in Sayre Borough. NTIER Bridge Lighting Upg |
Sayre Borough | $441,000 | |
| Crack sealing
various routes
various twps Bradford Co 2026 Crack Se |
$286,000 | ||
| SR 6 and East Lockhart St over Susquehanna River and West Packer Ave over Lehigh Ave, in Athens (Twp) and Sayre, Towanda, and Wysox (Boros), Bradford County
Bridge Preservation SR 6 over Susquehanna AND |
Sayre Borough | $3.6 million | |
| Emergency truss repairs SR 2010 over Susquehanna River in Terry and Wyalusing Townships SR 2010 over Susquehanna |
Terry Township, Wyalusing Township | $1.1 million | |
| Ballard St Over Sugar Ck Troy Borough Bridge Replacement Ballard St Br 2 |
Troy Borough | $110,000 | |
| River Street From South of SR 6 to North of State Street Towanda Borough Reconstruction Cent. Brad. Traff. Impv |
$100,000 | ||
| T-807 over Beckwith Creek, Wells Township Bridge Replacement, Retro-Active Reimbursement. T-807 over Beckwith Creek |
$972,468 | ||
| OVER SUGAR CREEK NORTH TOWANDA TWP. T-544 BRIDGE REHABILITATION Sugar Ck Br-Co Br#32 |
$800,000 | ||
| Scenic Overlook Along US 6 Wyalusing Township Construct Scenic Overlook Endless Mts. Overlook |
$1 | ||
| N. Towanda Twp to Wysox Twp Borough of Towanda, N. Towanda, Wysox and Towanda Townships Pedestrian/Biking Trail Upper Susq Trail Sys |
$658,000 | ||
| T-544 (County Bridge 32) over Sugar Creek North Towanda Twp Bridge Replacement T-544 over Sugar Creek |
$838,956 | ||
| Rehab of 1881 Lehigh Valley RR Station Sayre Borough Transportation Enhancement Lehigh Valley RR Station |
$418,000 | ||
| Scenic Overlook Site Improvements Transportation Enhancement Marie Antoinette Overlook |
$358,285 | ||
| Center Street Canton Reconstruction: Curbs, Drainage, Traffic Signals, etc. Center St. Reconstruct |
Canton Borough | $5.7 million | |
| Sayre Historical Society RR Museum Borough of Sayre Heating and AC project Sayre Museum AC AND Heat |
$109,962 | ||
| SR 4022 (Wilawana Road) over Chemung River
Athens Twp.
Bridger rehabilitation SR4022 ov Chemung River |
Athens Township | $13.5 million | |
| Two Bridges in Bradford and Tioga Counties, Bridge Rehabilitation, Deck Rehab. DF Deck N-TIER 10-11 |
Sylvania Borough | $120,000 | |
| SR 1029 (North Rome Road) over Tributary to Bullards Creek, Litchfield Township Bridge Rehabilitation SR1029 ov Tb Bullards Crk |
Litchfield Township | $65,000 | |
| SR 4015 (Wetona Rd) over Tributary to Sugar Creek,
Troy (Twp),
Bridge Replacement SR 4015 ov Tb Sugar Creek |
Troy Township | $136,828 | |
| ARLE - Signal Rehabilitation Towanda Boro ARLE Signals |
$168,390 | ||
| PA 14 over South Creek
South Creek Township
Bridge replacement PA 14 over South Creek |
South Creek Township | $3.5 million | |
| US 6 and PA 14 Intersection Troy Borough Intersection Improvement SR6/14 Intersection Impro |
Troy Township | $1.3 million |
Planned (68)
| Project | Where | Expected done | Programmed |
|---|---|---|---|
| SR 6 and SR 187 Intersection
Wysox Township
Intersection Improvement SR 6 AND SR 187 Intersect |
Wysox Township | $6 million | |
| Right-of-way vacation on SR 2025 SR 2025 Vacate |
Wyalusing Township | $5,000 | |
| Structural overlay
SR 154 from Grover Rd (SR3012) to South Ave (SR 3008) Grover Rd to South Ave |
Canton Borough, Canton Township | $730,000 | |
| SR 4031 (Coryland Rd) Over Trb Wolfe Creek Columbia Township, Bradford County Bridge rehabilitation SR4031 over Trb Wolfe Cre |
Columbia Township | $50,000 | |
| SR 4014 over Mill Creek in Springfield Township, Bradford County Bridge Rehabilitation - Superstructure Replacement SR 4014 over Mill Creek |
Springfield Township | $60,000 | |
| SR 14 Canton Township, Bradford County
Embankment repair SR 14 Canton Twp Embankme |
Canton Township | $100,000 | |
| Mill and Resurface
SR 4013 to East of Pine Run
Burlington Borough and Township Burlington to East of SR |
Burlington Borough, Burlington Township | $4.7 million | |
| Mill and Resurfacing
Wyalusing Borough Line to Mile Post 290
Wyalusing Borough, Wyalusing Township Wyalusing Boro Line to Mi |
Wyalusing Township | $5.6 million | |
| Bank stabilization
Asylum Twp
SR 187 ROW for DF Work |
Asylum Township | ||
| South Road (T-377) over Sugar Run
Terry Township
Bridge replacement T-377 over Sugar Run |
Terry Township | $800,000 | |
| SR 154 over Beech Flats Creek
Canton Township
Bridge replacement SR154 over Beech Flats Cr |
Canton Township | $3.1 million | |
| SR3008 (Southside Road) over Tributary to Towanda Creek
Leroy Township
Bridge replacement SR3008 over Tributary to |
Leroy Township | $75,000 | |
| SR 3008 (Southside Road) over Tributary to Towanda Creek
Franklin Township
Bridge replacement SR 3008 over Trib Towanda |
Franklin Township | $562,000 | |
| SR 1040 (Cadis Road) over Branch of Prince Hollow Run
Warren Township
Bridge replacement SR1040 over Branch Prince |
Warren Township | $425,000 | |
| SR 1033 (Laning Creek Road) North of Wysox
Wysox Township
Embankment failure repair Bradford SR 1033 Slide Re |
Wysox Township | $6.3 million | |
| SR 3015 (Preacher Brook Road) North West of Franklindale
Franklin Township
SR 3015 (Preacher Brook Road) North West of Franklindale
Franklin Township
Embankment failure repair Bradford SR 3015 Slide Re |
Franklin Township | $5 million | |
| SR 3002 (Overton Road) outside of New Albany Borough
New Albany Borough and Albany Township
New Alighment SR 3002 Realignment |
Albany Township | $10.7 million | |
| T-799 over Gaylord Creek
Pike Township, Bradford County T-799 over Gaylord Creek |
Pike Township | $505,000 | |
| Metal arch replacement SR 4024 Ridgebury Twp Bradford 4024 Metal Arch |
Ridgebury Township | ||
| Susquehanna River to SR 187
Wysox Twp
Mill and resurface Susquehanna River to SR 1 |
Wysox Township | $2.2 million | |
| SR 3019 (Bailey Corners Rd) over Tributary North Branch Towanda Creek
Granville Township SR 3019 over Tributary No |
Granville Township | $224,000 | |
| SR 3020 (Old Plank Rd) over Tributary of Susquehanna River
Towanda Borough
Bridge replacement SR 3020 over Tributary of |
Towanda Township | $75,000 | |
| SR 3030 (Seeley Farm Rd) over Tributary to Alba Creek
Canton Township
Bridge replacement SR 3030 over Tributary to |
Canton Township | $75,000 | |
| SR 4013 (Berwick Turnpike Rd) over West Branch Tomjack Creek
Smithfield Township
Bridge replacement SR 4013 over West Branch |
Smithfield Township | $75,000 | |
| SR4018 (Wolcott Hollow Rd) over tributary to wolcott creek
Athens Township SR4018 over Tributary to |
Athens Township | $75,000 | |
| T-109 (Moore Road) over Satterlee Creek in Athens Township, Bradford County
Bridge replacement T-109 ov Satterlee Creek |
Athens Township | $800,000 | |
| Mill and Resurface
Cummings Rd to Tomahawk Rd
N. Towanda AND Towanda Twps and Towanda Boro Cummings Rd to Tomahawk R |
North Towanda Township, Towanda Borough, Towanda Township | $7.4 million | |
| Slide correction on US 220 north of New Albany Borough in Albany Township. Embankment north of New A |
Albany Township, New Albany Borough | $20.2 million | |
| T-876 (Miller Road) over Satterlee Creek in Athens Township, Bradford County
Bridge Replacement T-876 over Satterlee Cree |
Athens Township | $500,000 | |
| Guiderail Upgrade
Various Routes
Various Twps 2027 Districtwide GR/UBE |
$750,000 | ||
| SR 367 over Fargo Creek, Tuscarora (Twp), Bridge Replacement SR 367 over Fargo Creek |
Tuscarora Township | $700,000 | |
| Redington Street over West Branch of Sugar Creek
Troy Borough
Bridge replacement Redington Ave ov W Branch |
Troy Borough | $1.2 million | |
| South Railroad Street over Fork of Sugar Creek
Troy Borough
Bridge replacement S Railroad St ov Fk Sugar |
Troy Borough | $1.3 million | |
| SR 4027 (Bucks Creek Road )over South Creek in South Creek Township
Bridge rehabilitation SR 4027 over South Creek |
South Creek Township | $1.5 million | |
| SR 4027 (Bucks Creek Road) over Buck Creek
Ridgebury Township, Bradford County
Bridge Replacement SR 4027 over Buck Creek |
Ridgebury Township | $1.4 million | |
| School Street (T-821) over Beckwith Creek
Wells Township
Bridge removal T-821 over Beckwith Creek |
Wells Township | $1.4 million | |
| PA706 over Cold Creek Stevens Township Bridge replacement SR 706 over Cold Creek |
Stevens Township | $1.7 million | |
| SR 467 over Rockwell Creek, Pike Township Bridge Replacement SR 467 over Rockwell Crk |
Pike Township | $700,000 | |
| SR 706 over Ross Creek, Stevens (Twp), Bridge Replacement SR 706 over Ross Creek |
Stevens Township | $1.3 million | |
| Prospect Street over Fallbrook Creek
Troy Borough
Bridge improvement Prospect Street over Fall |
Troy Borough | $510,000 | |
| SR 187 over Wappasening Creek AND Tributary to Wappasening Creek, Windham Township Bridge Replacement BMS# 08 0187 0880 0000 SR187 ov TrbWappaseningCr |
Windham Township | $1.3 million | |
| SR 4013 Segment 0010/0000 to 0250/0000 Bradford County Resurface SR3009 to SR4018 |
Burlington Borough, Burlington Township, Ridgebury Township, Smithfield Township, Springfield Township, West Burlington Township | $1.8 million | |
| Bridge rehabilitation
SR 1055 (Battle Creek Road) over Parks Creek
Rome Township, Bradford County SR 1055 Over Parks Creek |
Rome Township | $75,000 | |
| SR 2007 (Wilmot Road) over Sugar Run
Terry Township, Bradford County
Bridge rehabilitation SR2007 ov Sugar Run |
Terry Township | $75,000 | |
| SR 2016 over King Creek, Standing Stone Township, Bradford County Bridge rehabilitation SR 2016 over King Creek |
Standing Stone Township | $65,000 | |
| SR 3001 (Allens Crossing Rd)
Franklin Township, Bradford County
Bridge rehabilitation SR3001ovTowandaCreek |
Franklin Township | $1 million | |
| SR 3036 over South Fork of Sugar Creek Troy Township Bridge Replacement S. Fork of Sugar Creek |
Troy Township | $60,000 | |
| SR 4016 (Austinville Road) over South Creek
Columbia Township, Bradford County
Bridge rehabilitation SR 4016 Over South Creek |
Columbia Township | $75,000 | |
| SR 14 over Fall Brook. Troy Boro. Bridge Replacement SR 14 over Fall Brook |
Troy Borough | $1.9 million | |
| Project Delivery Assistance Northern Tier Region District 3-0, Bradford, Sullivan, AND Tioga Counties. HANDH N-TIER Dist 3-0 |
|||
| Northern Tier Region, Bradford, Sullivan, and Tioga Counties. Open Plan Services Open Plan Services N-TIER |
|||
| Northern Tier Region, Bradford, Sullivan, and Tioga Counties. Enviromental Services. Enviromental Srvcs N-TIER |
|||
| SR 3008 (Southside Road) over Towanda Creek, Franklin Township Bridge Rehabilitation BMS# 08 3008 0350 1523 SR3008 over Towanda Creek |
Franklin Township | $875,000 | |
| SR 14 (Sullivan St) over Tannery Creek,
Canton (Boro), Bradford County
Bridge replacement SR 14 over Tannery Creek |
Canton Borough | $2.5 million | |
| Bradford Cargill Stockpile Cargill Property SP |
Wyalusing Borough | ||
| SR 1040 over Babcock Run Warren Township Right of Way Acquisition Bradford SR 1040 R/W |
Warren Township | ||
| SR 187 (Main Street) over Tributary to Wysox Creek
Rome Borough
Bridge Replacement SR 187 ov Tr Wysox Cr |
Rome Borough | $1.5 million | |
| PA 187 over Parks Creek
Rome Township, Bradford County
Bridge Replacement SR 187 over Parks Creek |
Rome Borough, Rome Township | $3.7 million | |
| State Route 4013 over Three Falls Run Ridgebury Township Bridge rehabilitation SR4013 ov Three Falls Run |
Ridgebury Township | $150,000 | |
| State Route 4027 (Bucks Creek Road) over Bucks Creek
Ridgebury Township
Bridge replacement SR4027 ov Bucks Cr |
Ridgebury Township | $1.3 million | |
| SR 1021 (Rummerfield Creek Rd) over Rummerfield Creek
Standing Stone Township
BMS 08102100400828
Bridge Replacement SR1021 ov Rummerfield Crk |
Standing Stone Township | $2.9 million | |
| SR 187 from SR 1022 to Seven Hills Dr,
Rome Borough
Mill AND Resurface Roadway SR 1022 (North Rome Road) |
Rome Borough | $760,000 | |
| SR 1043 (Riverside Drive) from Potter Rd to the New York State Line,
Athens AND Litchfield Twps.
Resurface Roadway Potter Rd to NY Line |
Athens Township, Litchfield Township | $2.5 million | |
| State Route 1043 over Spaulding's Creek
Sheshequin Township
BMS 08104301700565
Bridge rehabilitation SR1043ovSpauldingCreek |
Sheshequin Township | $100,000 | |
| SR3020 From State Street to Bridge Street
Towanda Borough
Highway reconstruction State St to Bridge St |
$277,920 | ||
| SR187 over Wysox Creek
Rome Township
Bridge Replacement SR187 over Wysox Creek |
Rome Township | $4.2 million | |
| PA 187 over Durrell Creek Asylum Township Bridge replacement SR187 over Durrell Creek |
Asylum Township | $1.3 million | |
| State Route 1040 (Cadis Road) over Prince Hollow Run
Warren Township
Bridge rehabilitation SR1040ovPrinceHollowRun |
Warren Township | $200,000 |
NYSDOT’s “Projects in Your Neighborhood” and, in Pennsylvania, PennDOT’s project data. Dollars shown where the project is also in the transportation plan below. Dates are the agencies’ estimates. Regional projects that include the county are listed too. New York contracts are let through NYSDOT construction notices ↗.
Economic development
- Business pulse: new businesses, business property and public money by the numbers.
Disaster recovery and flood protection
Public roads, buildings and utilities rebuilt with FEMA aid after declared disasters.
| Disaster | Year | Projects | Project cost |
|---|---|---|---|
| Flood (DR-4408) ↗ | 2018 | 128 | $17.6 million |
| Flood (DR-4292) ↗ | 2016 | 12 | $3.4 million |
| Flood (DR-4030) ↗ | 2011 | 472 | $13.5 million |
| Severe Storm(s) (DR-4003) ↗ | 2011 | 221 | $7 million |
| Severe Storm(s) (DR-1684) ↗ | 2007 | 73 | $467,402 |
| Severe Storm(s) (DR-1649) ↗ | 2006 | 59 | $533,974 |
| Severe Storm(s) (DR-1587) ↗ | 2005 | 32 | $346,327 |
| Hurricane (DR-1557) ↗ | 2004 | 85 | $1.5 million |
FEMA’s Public Assistance and Hazard Mitigation Assistance data (OpenFEMA).
More to follow
- Environmental reviews and permits: DEC’s weekly Environmental Notice Bulletin for Chemung County ↗ (new permits, SEQR reviews, solar and industrial projects).
- Water and sewer projects: the state Environmental Facilities Corporation’s yearly project lists ↗.
- Meetings where projects are decided: public meetings and the development watch. The neighboring counties’ agendas are on each county’s page under Neighbors.